Construction of outdoor electrical power equipment and power transformer inside the 150/33KV substation in Kasidiari

Construction of outdoor electrical power equipment and power transformer inside the 150/33KV substation in Kasidiari

Kasidiaris 150 / 33 KV substation composition:

  • Two (2) busbars 150 KV (with three pole switch, two circuit breakers, voltage and current transformers, protection relay, capacitor coupler, sensors protection system)
  • 150 KV coupler with required scaffold
  • Two (2) 150 KV power transforming bus, with three pole 150KV switch, voltage and current transformers and a 150KV circuit breaker
  • Two (2) 33 KV power transforming bus (Τ.Μ.)
  • Four (4) 33KV busbars Independent Power Producer Panels (I.P.P.M.)
  • One (1) bus coupler 33 KV

The following works have been carried out:

  • Installation and adjustment of all outdoor electrical power equipment as well as the necessary equipotential protection panels
  • Stringing of all outdoor electrical equipment
  • Supply and installation of insulators, anchor points and various materials
  • Assembly of the two (2) power transformers under the supervision of the manufacturer
  • Coordination of installation of the two (2) power transformers under the supervision of the manufacturer
  • Connection of all scaffolding and electrical equipment to grounding system of the substation
Category
Substation Construction - Construction Projects
A random selection of our projects
Kasidiari Substation
TRANSMISSION LINE CONSTRUCTION
Wind Energy Park SERVOUNIA
CONSTRUCTIONS
Gorofaki Substation
SERVICE MAINTENANCE
Paleochori Substation
TRANSMISSION LINE CONSTRUCTION
Request Information
Interested in the solutions we offer? Let's talk!