Construction of two (2) 150KV towers inside and outside of Georgianon substation that connects the wind park Eressou and Lefkes with the grid

Construction of two (2) 150KV towers inside and outside of Georgianon substation that connects the wind park Eressou and Lefkes with the grid

  • Complete pylon foundation construction and their grounding
  • Pylon erection
  • Complete unwinding of the phase conductors, phase adjustments and connection to the tension chains on pylons. Assembly and suspension on the pylons of the tension chains
  • Installation on the conductors of reinforcements bars, oscillation dampers, and counterweights
  • Installation of extra pylon groundings
Category
High Voltage Transmission Lines Construction
A random selection of our projects
Gorofaki Substation
SERVICE MAINTENANCE
Kasidiari Substation
TRANSMISSION LINE CONSTRUCTION
Paleochori Substation
TRANSMISSION LINE CONSTRUCTION
Wind Energy Park SERVOUNIA
CONSTRUCTIONS