Construction of the 150KV transmission line between Desfinas substation and grid (Lamia-Alumine)
Wind park in Desfinas is the third biggest in Greece, an investment of 150 million €, includes 35 wind turbines with a total nominal power of 82.25MW. The involvement of our company in the project is listed below:
- Excavation, drilling, reinforcement armature setup and concreting of all pylons bases
- Assembly and pylon erection
- Supply, installation, assembly of pylons micro materials and insulators
- Stringing of protection conductor (O.P.G.W.) and phase conductors
- Adjustment, stabilization, phase conductors and protection conductor connections (O.P.G.W.)
- Pylon grounding (including resistance measurement)
- Delivery of the transmission line to the transmission system maintenance
- Interconnection of the transmission line between substation in Desfians and the grid