Greek - Ελληνικά English
New exclusive service in Greece - topographic surveys with drone Lidar Scanning
Projects

Construction of the 150KV transmission line for the connection of the 33/150 KV substation in Kasidiaris with the grid

Construction of the 150KV transmission line for the connection of the 33/150 KV substation in Kasidiaris with the grid

On the ridge of Kasidiaris, at the municipality limits between Ano Pogonio and Zitsa, one of the largest wind parks in Greece has been installed, with a total nominal power of 90MW in an area of 4,500 hectares. Our contribution to the construction of the wind park is listed below:

  • Supervision of pylon surrounding clearance and excavation
  • Reinforcement armature setup, concreting, base adjustments and pylon base erection
  • Assembly and pylon erection
  • Supply, installation and assembly of pylons micro materials
  • Stringing of protection conductor (O.P.G.W.) and phase conductors
  • Interconnection of the transmission line between substation in Kasidiaris and the grid
  • Pylon grounding and resistance measurement
Category
High Voltage Transmission Lines Construction
A random selection of our projects
Paleochori Substation
TRANSMISSION LINE CONSTRUCTION
Kasidiari Substation
TRANSMISSION LINE CONSTRUCTION
Wind Energy Park SERVOUNIA
CONSTRUCTIONS
Gorofaki Substation
SERVICE MAINTENANCE
Request Information
Interested in the solutions we offer? Let's talk!