GEOERGA ELECTRIC ENERGY L.T.D. has to studied numerous projects, the most important of which are the following:

  • Study of 150 KV Transmission Line, Length 0.1 km, that connect the Substation IPATOU - SYSTEM (LAMIA -SCIMATARI) with the System, Type B, Property of PELOPONNISIAKOS SUN 1 PHOTOVOLTAIC S.A.
    [ read more ]
  • Project Photo #27

    Study of 150 KV Transmission Line, Length 0.1 km, that connect the Substation SIMOPOULOU-SYSTEM (PATRA II -PIRGOS /II) with the System, Type 2B, Property of ELECTROMEK S.A.
    [ read more ]
  • Project Photo #6

    Study of 150 KV Transmission Line, Length 13.50 km, that connect the Substation CITHERONAS with the System, Type B, Property of GAMESA S.A.
    [ read more ]
  • Study of 150 KV Transmission Line, Length 22.50 km, that connect the Substation KILKIS with the Substation KILKIS 2, Type 2B & B, Property of EDF EN GREECE S.A.
    [ read more ]
  • Study of 150 KV Transmission Line, Length 9.00 km, that connect the Substation AMIFDALEA with the Substation ANTIA, S. EVIA, Type 2B, Property of TERNA ENERGY S.A & ELIKA S.A.
    [ read more ]
  • Study of 150 KV Transmission Line, Length 8.00 km, that connect the Substation ANTIA with the Substation PLATANISTOS, S. EVIA, Type 2B, Property of TERNA ENERGY S.A. & ELIKA S.A.
    [ read more ]
  • Study of 150 KV Transmission Line, Length 12.00 km, that connect the Substation PLATANISTOS with the LANDING POINT, Type 2B, Property of TERNA ENERGY S.A. & ELIKA S.A.
    [ read more ]
  • Project Photo #19

    Study of 150 KV Transmission Line, Length 0.1 km, that connect the Substation ANTHEMIA - SYSTEM (ARGA -NAOUSA) with the System, Type B, Property of NORTH GREECE SOLAR PARKS S.A.
    [ read more ]
  • Study of 150 KV Transmission Line, Length 0.1 km, that connect the Substation CHORIGI-SYSTEM (KILKIS-OSE POLIKASTROU) with the System, Type B, Property of ELECTROMEK S.A.